H & H Industries’ expert plumbers installed and/or fabricated all the piping and fixtures for this four story, new-construction educational building on the University of Wisconsin – Whitewater campus.

This design/build project included bathrooms, classroom sinks and storm drainage. Constructed during spring, summer and fall of 2008, H & H Industries was kept busy installing all the toilets, urinals and bathroom sinks.

H & H also installed stainless steel sinks in all the classrooms. In addition to this, we also installed drinking fountains throughout the building and sinks and fixtures in several laboratories.